SEWAGE TREATMENT PLANT PROJECT (PHASE 1: PACKAGE 1) PANTAI TRUNK SEWER CONNECTION TUNNEL. SLOPE STABILIZATION WORKS Written by adminApril 4, 2024 2 DRILLING EXPLORATION MEGAPUR COPPER MINE PROJECT ( Diamond Core Drilling Works) Prev Post PROPOSED SLOPE STABILIZATION WORKS AT KM383.53, KM361.60& KM373 TG. MALIM TO BIDOR Next Post