• MRT SSP Package V205 – Viaduct Guideway. Micropiling Works
    MRT SSP Package V205 – Viaduct Guideway. Micropiling Works
    MICROPILING WORKS
  • KVMRT AMPANG PARK STATION, KUALA LUMPUR (Retaining Wall Works)
    KVMRT AMPANG PARK STATION, KUALA LUMPUR (Retaining Wall Works)
    Other projects
  • Setia Bayuemas – Phase A16 (21 Units DSSO). Underpinning Works
    Setia Bayuemas – Phase A16 (21 Units DSSO). Underpinning Works
    Other projects
  • AXIATA ARENA
    AXIATA ARENA
    Construction Works
  • BUKIT JALIL SPORT COMPLEX- STEEL STRUCTURE
    BUKIT JALIL SPORT COMPLEX- STEEL STRUCTURE
    Construction Works
  • GEOLOGIST AND GEOTECHNICAL ENGINEERING SERVICES AT SRI MANJUNG, PERAK (Soil Investigation Works)
    GEOLOGIST AND GEOTECHNICAL ENGINEERING SERVICES AT SRI MANJUNG, PERAK (Soil Investigation Works)
    Other projects
  • MAINHEAD B: SLOPE REHABILITATION WORKS IN THE VICINITY OF PERGAU POWER STATION
    MAINHEAD B: SLOPE REHABILITATION WORKS IN THE VICINITY OF PERGAU POWER STATION
    Slope Stabilization
  • SOIL NAILING AT SECTION 9 – 13 & 14 FOR PROJECT AT LOT 12270 & 71 MUKIM BUKIT KATIL, MELAKA (Soil Nailing Works)
    SOIL NAILING AT SECTION 9 – 13 & 14 FOR PROJECT AT LOT 12270 & 71 MUKIM BUKIT KATIL, MELAKA (Soil Nailing Works)
    Slope Stabilization
  • PROJEK MEMBINA LEBUHRAYA KOTA BHARU KE KUALA KRAI, KELANTAN (PAKEJ 2C & 3A: KOK LANAS KE BUKIT TIU (Soil Nailing Works)
    PROJEK MEMBINA LEBUHRAYA KOTA BHARU KE KUALA KRAI, KELANTAN (PAKEJ 2C & 3A: KOK LANAS KE BUKIT TIU (Soil Nailing Works)
    Slope Stabilization
  • FT185 Road Repair & Slope Rehabilitation. Geotechnical Works, Earthworks, Slope Stabilisation, Occupational Safety & Health, Environmental Protection & Routine Maintenance Works
    FT185 Road Repair & Slope Rehabilitation. Geotechnical Works, Earthworks, Slope Stabilisation, Occupational Safety & Health, Environmental Protection & Routine Maintenance Works
    Current Projects, Other projects
  • Gemas–Johor Bahru Electrified Double Track (EDT). Skin Wall Works for CBP & Sheet Pile Walls
    Gemas–Johor Bahru Electrified Double Track (EDT). Skin Wall Works for CBP & Sheet Pile Walls
    Other projects
  • Proposed Development of 2 Apartment Towers. Apartment Tower Development Works
    Proposed Development of 2 Apartment Towers. Apartment Tower Development Works
    Slope Stabilization
  • ZITRO HOTEL
    ZITRO HOTEL
    Construction Works
  • TNB PERGAU SITE OFFICE
    TNB PERGAU SITE OFFICE
    Construction Works
  • JKR OFFICE BLUE VALLEY
    JKR OFFICE BLUE VALLEY
    Construction Works
  • Proposed Development of 1 Commercial Block (CP2). Commercial Building Development Works
    Proposed Development of 1 Commercial Block (CP2). Commercial Building Development Works
    MICROPILING WORKS
  • Construction of 2 JKME Buildings (DBKL). Micropile Works
    Construction of 2 JKME Buildings (DBKL). Micropile Works
    MICROPILING WORKS
  • Underground Tunnel Construction – Sunway South Quay (CP2) & Elephant Walk. Shotcrete Works
    Underground Tunnel Construction – Sunway South Quay (CP2) & Elephant Walk. Shotcrete Works
    Other projects
  • Entrance Gate, Guard House, Access Road & Bridge Construction. Infrastructure, Bridge Construction & Road Upgrading Works
    Entrance Gate, Guard House, Access Road & Bridge Construction. Infrastructure, Bridge Construction & Road Upgrading Works
    MICROPILING WORKS
  • Damansara–Shah Alam Elevated Expressway (DASH) – Package CB2. Mainline Construction & Associated Works
    Damansara–Shah Alam Elevated Expressway (DASH) – Package CB2. Mainline Construction & Associated Works
    MICROPILING WORKS
  • Setiawangsa–Pantai Expressway (SPE) – Kerinchi Interchange. Slope Works
    Setiawangsa–Pantai Expressway (SPE) – Kerinchi Interchange. Slope Works
    Other projects
  • Titiwangsa Station (ST2) – Addition & Alteration Works. Micropile Works & Associated Works
    Titiwangsa Station (ST2) – Addition & Alteration Works. Micropile Works & Associated Works
    MICROPILING WORKS
  • Slope Repair & Stabilisation Works. Grouting Works
    Slope Repair & Stabilisation Works. Grouting Works
    Other projects
  • TUNKU ABDUL RAHMAN UNIVERSITY COLLEGE
    TUNKU ABDUL RAHMAN UNIVERSITY COLLEGE
    Slope Stabilization
  • Pumping Station 3 – Main Water Reticulation (Plot A & B). Soil Nailing Works
    Pumping Station 3 – Main Water Reticulation (Plot A & B). Soil Nailing Works
    Slope Stabilization
  • Sunway Medical Centre Phase 4 (SMC4). Development Works
    Sunway Medical Centre Phase 4 (SMC4). Development Works
    MICROPILING WORKS
  • Sunway Medical Centre Ipoh – 8-Storey Private Medical Centre. Soil Investigation, Micropile & Shotcrete Works
    Sunway Medical Centre Ipoh – 8-Storey Private Medical Centre. Soil Investigation, Micropile & Shotcrete Works
    MICROPILING WORKS
  • MEMBINA DAN MENYIAPKAN SATU (1) BLOK KUARTERS KELAS F & G (4 PINTU) UNTUK PEJABAT HUTAN DAERAH CAMERON HIGHLANDS PAHANG DARUL MAKMUR
    MEMBINA DAN MENYIAPKAN SATU (1) BLOK KUARTERS KELAS F & G (4 PINTU) UNTUK PEJABAT HUTAN DAERAH CAMERON HIGHLANDS PAHANG DARUL MAKMUR
    MICROPILING WORKS
  • KLCC North East Car Park (NEC) – Package 1. Car Park Construction & Associated Works
    KLCC North East Car Park (NEC) – Package 1. Car Park Construction & Associated Works
    GROUND ANCHOR WORKS
  • 3-Storey Commercial Complex with 3 Basement Levels. Commercial Building, Basement Car Park & Security Tunnel Works
    3-Storey Commercial Complex with 3 Basement Levels. Commercial Building, Basement Car Park & Security Tunnel Works
    GROUND ANCHOR WORKS
  • Mixed Development – Serviced Apartments, Shopping Complex & Office Towers. Mixed Development Construction Works
    Mixed Development – Serviced Apartments, Shopping Complex & Office Towers. Mixed Development Construction Works
    GROUND ANCHOR WORKS
  • CADANGAN PEMBANGUNAN ISTANA BARU TERENGGANU MUKIM CENDERING, TERENGGANU DARUL IMAN
    CADANGAN PEMBANGUNAN ISTANA BARU TERENGGANU MUKIM CENDERING, TERENGGANU DARUL IMAN
    GROUND ANCHOR WORKS
  • 17-Storey Office Building with 3 Basement Parking Levels. Office Building & Basement Car Park Construction Works
    17-Storey Office Building with 3 Basement Parking Levels. Office Building & Basement Car Park Construction Works
    GROUND ANCHOR WORKS
  • KAJIAN KOLAM BEKAS LOMBONG SEBAGAI KOLAM TAKUNGAN ALIRAN AIR BANJIR DI LEMBANGANSUNGAI SELANGOR
    KAJIAN KOLAM BEKAS LOMBONG SEBAGAI KOLAM TAKUNGAN ALIRAN AIR BANJIR DI LEMBANGANSUNGAI SELANGOR
    DEEP WELL DRILLING WORKS
  • CADANGAN PEMBANGUNAN TAPAK PELUPUSAN SISA PEPEJAL SANITARI DI TEMERLOH, PAHANG DARUL MAKMUR
    CADANGAN PEMBANGUNAN TAPAK PELUPUSAN SISA PEPEJAL SANITARI DI TEMERLOH, PAHANG DARUL MAKMUR
    DEEP WELL DRILLING WORKS
  • MENAIKTARAF SISTEM SALIRAN SG. RASAU FASA II, KOLAM TAKUNGAN BANJIR, DI ATAS LOT 336 & KERJA-KERJA BERKAITAN.
    MENAIKTARAF SISTEM SALIRAN SG. RASAU FASA II, KOLAM TAKUNGAN BANJIR, DI ATAS LOT 336 & KERJA-KERJA BERKAITAN.
    DEEP WELL DRILLING WORKS
  • 3-Storey Police Station & 18-Storey Quarters Building. USJ 8, UEP Subang Jaya, Selangor
    3-Storey Police Station & 18-Storey Quarters Building. USJ 8, UEP Subang Jaya, Selangor
    DEEP WELL DRILLING WORKS
  • River of Life (RoL) – Precinct 7 Improvement & Beautification Works. Improvement & Beautification Works
    River of Life (RoL) – Precinct 7 Improvement & Beautification Works. Improvement & Beautification Works
    CAISSON WORKS
  • Classroom Extension & Renovation Works – Cempaka Group. Building Extension & Alteration Works
    Classroom Extension & Renovation Works – Cempaka Group. Building Extension & Alteration Works
    CAISSON WORKS
  • PROPOSED CAISSON PILE AT LOT 962, MUKIM BANDAR CHERAS, DAERAH HULU LANGAT FOR CHERAS HONG SOON DEVELOPMENT SDN BHD.
    PROPOSED CAISSON PILE AT LOT 962, MUKIM BANDAR CHERAS, DAERAH HULU LANGAT FOR CHERAS HONG SOON DEVELOPMENT SDN BHD.
    CAISSON WORKS
  • 2 Blocks of 24-Storey SOHO & Serviced Apartments. SOHO, Serviced Apartments, Retail & Car Park Construction Works
    2 Blocks of 24-Storey SOHO & Serviced Apartments. SOHO, Serviced Apartments, Retail & Car Park Construction Works
    CAISSON WORKS
  • Serviced Apartments & 3-Storey Shop Offices. Lot 32999, Section 1, Bandar Cheras, Hulu Langat, Selangor
    Serviced Apartments & 3-Storey Shop Offices. Lot 32999, Section 1, Bandar Cheras, Hulu Langat, Selangor
    CAISSON WORKS
  • SUNWAY MEDICAL CENTRE 4 (Jet Grouting Works)
    SUNWAY MEDICAL CENTRE 4 (Jet Grouting Works)
    Other projects
  • DAYA BUMI PROJECT (Jet Grouting Works)
    DAYA BUMI PROJECT (Jet Grouting Works)
    Other projects
  • MMC GAMUDA JV MRT AT MERDEKA STATION (Jet Grouting Works)
    MMC GAMUDA JV MRT AT MERDEKA STATION (Jet Grouting Works)
    Other projects
  • PROPOSED MENARA TUN RAZAK, JALAN RAJA LAUT (Jet Grouting Works)
    PROPOSED MENARA TUN RAZAK, JALAN RAJA LAUT (Jet Grouting Works)
    Other projects
  • 2 Blocks of 24-Storey SOHO & Serviced Apartments. Jet Grouting Works
    2 Blocks of 24-Storey SOHO & Serviced Apartments. Jet Grouting Works
    Other projects
  • Stadium Putra & Aquatic Stadium Upgrading Works. Demolition & Renovation Works
    Stadium Putra & Aquatic Stadium Upgrading Works. Demolition & Renovation Works
    Other projects
  • Stadium Putra Upgrading Works. Demolition Works
    Stadium Putra Upgrading Works. Demolition Works
    Other projects
  • 46 Units of 4-Storey Terrace Houses (Type A & B). Jalan 3/9, Bandar Baru Selayang, Gombak, Selangor. Soil Nailing Works
    46 Units of 4-Storey Terrace Houses (Type A & B). Jalan 3/9, Bandar Baru Selayang, Gombak, Selangor. Soil Nailing Works
    Other projects
  • DUTA-ULU KELANG EXPRESSWAY (DUKE) SECTION 2. BORED PILING WORK AT CH11480 – CH11540 (LHS) ( Bored Pile Works)
    DUTA-ULU KELANG EXPRESSWAY (DUKE) SECTION 2. BORED PILING WORK AT CH11480 – CH11540 (LHS) ( Bored Pile Works)
    Other projects
  • VELOCITY TUNNEL, UNDERPASS & ASSOCIATED WORKS SOIL MIXING WORK & SOIL INVESTIGATION WORKS (Soil Mixing Works)
    VELOCITY TUNNEL, UNDERPASS & ASSOCIATED WORKS SOIL MIXING WORK & SOIL INVESTIGATION WORKS (Soil Mixing Works)
    Other projects
  • 49 Units of 2½-Storey Terrace Houses. Mukim Petaling, Petaling, Selangor. Soil Mixing Works
    49 Units of 2½-Storey Terrace Houses. Mukim Petaling, Petaling, Selangor. Soil Mixing Works
    Other projects
  • ULU JELAI HYDROELECTRIC PROJECT LOT CW2/EM1 (Soil Mixing Works)
    ULU JELAI HYDROELECTRIC PROJECT LOT CW2/EM1 (Soil Mixing Works)
    Other projects
  • Proposed Commercial Development – Lot 52541. Petaling Jaya, Damansara, Petaling, Selangor. Soil Mixing Works
    Proposed Commercial Development – Lot 52541. Petaling Jaya, Damansara, Petaling, Selangor. Soil Mixing Works
    Other projects
  • PROPOSED SOIL MIXING WORKS TO THE EXISTING RTG –E-BLOCK AT CONTAINER TERMINAL – 1 OF NORTH PORT (Soil Mixing Works)
    PROPOSED SOIL MIXING WORKS TO THE EXISTING RTG –E-BLOCK AT CONTAINER TERMINAL – 1 OF NORTH PORT (Soil Mixing Works)
    Other projects
  • 92-Storey Office Tower & 5-Storey Office Annex – Tun Razak Exchange (TRX). Concrete Coring Works
    92-Storey Office Tower & 5-Storey Office Annex – Tun Razak Exchange (TRX). Concrete Coring Works
    Other projects
  • HQ DIAMOND CORE DRILLING AT MEGAPUR, PAHANG ( Diamond Core Drilling Works)
    HQ DIAMOND CORE DRILLING AT MEGAPUR, PAHANG ( Diamond Core Drilling Works)
    Other projects
  • 2 DRILLING EXPLORATION MEGAPUR COPPER MINE PROJECT ( Diamond Core Drilling Works)
    2 DRILLING EXPLORATION MEGAPUR COPPER MINE PROJECT ( Diamond Core Drilling Works)
    Other projects
  • SEWAGE TREATMENT PLANT PROJECT (PHASE 1: PACKAGE 1) PANTAI TRUNK SEWER CONNECTION TUNNEL. SLOPE STABILIZATION WORKS
    SEWAGE TREATMENT PLANT PROJECT (PHASE 1: PACKAGE 1) PANTAI TRUNK SEWER CONNECTION TUNNEL. SLOPE STABILIZATION WORKS
    Slope Stabilization
  • PROPOSED SLOPE STABILIZATION WORKS AT KM383.53, KM361.60& KM373 TG. MALIM TO BIDOR
    PROPOSED SLOPE STABILIZATION WORKS AT KM383.53, KM361.60& KM373 TG. MALIM TO BIDOR
    Slope Stabilization
  • SG.SELANGOR WATER SUPPLY SCHEME PHASE 3 PROPOSED  CONSTRUCTION & COMPLETION OF SLOPE STABILIZATION WORK AT KG. GERACHI
    SG.SELANGOR WATER SUPPLY SCHEME PHASE 3 PROPOSED CONSTRUCTION & COMPLETION OF SLOPE STABILIZATION WORK AT KG. GERACHI
    Slope Stabilization
  • Railway Track Restoration & Slope Stabilisation – Package C. Gua Musang to Tumpat, Kelantan. Civil Works
    Railway Track Restoration & Slope Stabilisation – Package C. Gua Musang to Tumpat, Kelantan. Civil Works
    Slope Stabilization
  • BANDAR BARU SELAYANG
    BANDAR BARU SELAYANG
    Slope Stabilization
  • 3 Blocks of Condominiums – Sime Darby Property (Golfhome). Jalan Bukit Kiara 1, Kuala Lumpur. Micropiling Works
    3 Blocks of Condominiums – Sime Darby Property (Golfhome). Jalan Bukit Kiara 1, Kuala Lumpur. Micropiling Works
    MICROPILING WORKS
  • 3-Storey Substation Building with 1 Basement (PPU3 – 33kV/11kV). Micropiling Work
    3-Storey Substation Building with 1 Basement (PPU3 – 33kV/11kV). Micropiling Work
    MICROPILING WORKS
  • Railway Track Rehabilitation – Package B. Track Formation Rehabilitation, Ballast Replacement & Associated Works
    Railway Track Rehabilitation – Package B. Track Formation Rehabilitation, Ballast Replacement & Associated Works
    Slope Stabilization
  • Slope Failure Repair Works – FT185. Slope Repair & Stabilisation Works
    Slope Failure Repair Works – FT185. Slope Repair & Stabilisation Works
    Slope Stabilization
  • ULU JELAI HYDROELECTRIC PROJECT – LOT CW3 POWER INTAKE TOWER AND OPERATION PLATFORM
    ULU JELAI HYDROELECTRIC PROJECT – LOT CW3 POWER INTAKE TOWER AND OPERATION PLATFORM
    MICROPILING WORKS
  • ULU JELAI HYDROELECTRIC PROJECT – LOT CW1 & CW2
    ULU JELAI HYDROELECTRIC PROJECT – LOT CW1 & CW2
    Slope Stabilization
  • 2 Blocks of 47-Storey Serviced Apartments (453 Units) & Existing Commercial Building. Development Works
    2 Blocks of 47-Storey Serviced Apartments (453 Units) & Existing Commercial Building. Development Works
    MICROPILING WORKS
  • 40-Storey Condominium Development – Modern Plus. Lot 2356, Jalan Kiara 5, Kuala Lumpur. Soil Nailing & Guniting Works
    40-Storey Condominium Development – Modern Plus. Lot 2356, Jalan Kiara 5, Kuala Lumpur. Soil Nailing & Guniting Works
    Current Projects
  • SLOPE REHABILITATION WORKS AT KM15 JALAN TERANG, PERGAU POWER STATION (Slope Protection Works)
    SLOPE REHABILITATION WORKS AT KM15 JALAN TERANG, PERGAU POWER STATION (Slope Protection Works)
    Slope Stabilization
  • Main Drainage System Upgrading for Flash Flood Mitigation. Micropiling Works
    Main Drainage System Upgrading for Flash Flood Mitigation. Micropiling Works
    MICROPILING WORKS
  • 3-Storey House with Swimming Pool. Residential Building Construction Works
    3-Storey House with Swimming Pool. Residential Building Construction Works
    Current Projects
  • 69 Units of 3-Storey Shop Offices & Electrical Substations. Lot 12270 & 12271, Bukit Katil, Hang Tuah Jaya, Melaka
    Slope Stabilization
  • DUKE Highway – Slope Remedial & Drainage Works. KM 11.7, Hillview Interchange, DUKE Highway
    DUKE Highway – Slope Remedial & Drainage Works. KM 11.7, Hillview Interchange, DUKE Highway
    Current Projects
  • 2 JKME Buildings – DBKL.  Lot 48, Section 91, Jalan Cheras, Kuala Lumpur. Micropiling Works
    2 JKME Buildings – DBKL. Lot 48, Section 91, Jalan Cheras, Kuala Lumpur. Micropiling Works
    Current Projects
  • MVS Southpoint Hotel. Micropile Underpinning Works, Reinforced Concrete Pile Caps & Demolition Works
    MVS Southpoint Hotel. Micropile Underpinning Works, Reinforced Concrete Pile Caps & Demolition Works
    Current Projects
  • SLOPE REHABILITATION WORKS IN THE VICINITY OF PERGAU HYDROELECTRIC POWER PLANT (TERANG ROAD KM 17, SJ PERGAU) (Slope Reprofiling with Gabion Cage Protection)
    SLOPE REHABILITATION WORKS IN THE VICINITY OF PERGAU HYDROELECTRIC POWER PLANT (TERANG ROAD KM 17, SJ PERGAU) (Slope Reprofiling with Gabion Cage Protection)
    Current Projects
  • Phase 1A – 4-Storey Logistics Hub & Multi-Level Car Park. Persiaran Selangor, Section 16, Shah Alam, Selangor
    Phase 1A – 4-Storey Logistics Hub & Multi-Level Car Park. Persiaran Selangor, Section 16, Shah Alam, Selangor
    Current Projects
IMG-20170614-WA0038
IMG-20170614-WA0038
IMG-20170314-WA0015
IMG-20170314-WA0015
IMG-20170909-WA0009
IMG-20170909-WA0009
IMG-20170909-WA0020
IMG-20170909-WA0020
MRT SSP Package V205 – Viaduct Guideway. Micropiling Works
Categories :
MICROPILING WORKS
URL : View Project
teh-bunga-1173×440
teh-bunga-1173×440
information-1173×440
information-1173×440
nutrisi-1173×440
nutrisi-1173×440
soya-bean-1173×440
soya-bean-1173×440
yeos-1173×440
yeos-1173×440
KVMRT AMPANG PARK STATION, KUALA LUMPUR (Retaining Wall Works)
Categories :
Other projects
URL : View Project
video-capture-6791
video-capture-6791
Setia Bayuemas – Phase A16 (21 Units DSSO). Underpinning Works
Categories :
Other projects
URL : View Project
putra-indoor-stadium
putra-indoor-stadium
AXIATA ARENA
Categories :
Construction Works
URL : View Project
IMG-20170502-WA0043
IMG-20170502-WA0043
IMG-20170502-WA0042
IMG-20170502-WA0042
IMG-20170502-WA0041
IMG-20170502-WA0041
IMG-20170502-WA0036
IMG-20170502-WA0036
IMG-20170502-WA0035
IMG-20170502-WA0035
IMG-20170502-WA0034
IMG-20170502-WA0034
IMG-20170502-WA0033
IMG-20170502-WA0033
BUKIT JALIL SPORT COMPLEX- STEEL STRUCTURE
Categories :
Construction Works
URL : View Project
Untitled1
Untitled1
DSCN1126_web-ezgif.com-gif-to-jpg-converter
DSCN1126_web-ezgif.com-gif-to-jpg-converter
GEOLOGIST AND GEOTECHNICAL ENGINEERING SERVICES AT SRI MANJUNG, PERAK (Soil Investigation Works)
Categories :
Other projects
URL : View Project
WhatsApp Image 2024-02-13 at 11.50.07
WhatsApp Image 2024-02-13 at 11.50.07
WhatsApp Image 2024-02-13 at 17.35.53
WhatsApp Image 2024-02-13 at 17.35.53
WhatsApp Image 2024-04-09 at 14.10.28
WhatsApp Image 2024-04-09 at 14.10.28
WhatsApp Image 2024-04-17 at 10.23.50
WhatsApp Image 2024-04-17 at 10.23.50
Picture1
Picture1
Picture2
Picture2
Picture3
Picture3
Picture4
Picture4
Picture5
Picture5
Picture6
Picture6
Picture7
Picture7
Picture8
Picture8
Picture9
Picture9
MAINHEAD B: SLOPE REHABILITATION WORKS IN THE VICINITY OF PERGAU POWER STATION
Categories :
Slope Stabilization
URL : View Project
DCIM100MEDIADJI_0058.JPG
DCIM100MEDIADJI_0058.JPG
DCIM100MEDIADJI_0051.JPG
DCIM100MEDIADJI_0051.JPG
SOIL NAILING AT SECTION 9 – 13 & 14 FOR PROJECT AT LOT 12270 & 71 MUKIM BUKIT KATIL, MELAKA (Soil Nailing Works)
Categories :
Slope Stabilization
URL : View Project
WhatsApp Image 2024-02-29 at 14.21.13 (1)
WhatsApp Image 2024-02-29 at 14.21.13 (1)
WhatsApp Image 2023-10-23 at 08.41.00
WhatsApp Image 2023-10-23 at 08.41.00
WhatsApp Image 2023-09-26 at 10.01.37 (1)
WhatsApp Image 2023-09-26 at 10.01.37 (1)
WhatsApp Image 2023-06-22 at 09.43.52
WhatsApp Image 2023-06-22 at 09.43.52
PROJEK MEMBINA LEBUHRAYA KOTA BHARU KE KUALA KRAI, KELANTAN (PAKEJ 2C & 3A: KOK LANAS KE BUKIT TIU (Soil Nailing Works)
Categories :
Slope Stabilization
URL : View Project
DCIM100MEDIADJI_0097.JPG
DCIM100MEDIADJI_0097.JPG
DCIM100MEDIADJI_0092.JPG
DCIM100MEDIADJI_0092.JPG
DCIM100MEDIADJI_0090.JPG
DCIM100MEDIADJI_0090.JPG
DCIM100MEDIADJI_0083.JPG
DCIM100MEDIADJI_0083.JPG
DCIM100MEDIADJI_0067.JPG
DCIM100MEDIADJI_0067.JPG
DCIM100MEDIADJI_0088.JPG
DCIM100MEDIADJI_0088.JPG
WhatsApp Image 2024-05-21 at 10.09.47
WhatsApp Image 2024-05-21 at 10.09.47
2..
2..
pembaikan
pembaikan
pembaikan2
pembaikan2
pembaikan3
pembaikan3
pembaikan4
pembaikan4
pembaikan5
pembaikan5
pembaikan6
pembaikan6
pembaikan7
pembaikan7
PictureS1
PictureS1
FT185 Road Repair & Slope Rehabilitation. Geotechnical Works, Earthworks, Slope Stabilisation, Occupational Safety & Health, Environmental Protection & Routine Maintenance Works
Categories :
Current Projects, Other projects
URL : View Project
IMG-20220906-WA0049
IMG-20220906-WA0049
Gemas-Johor-Bahru-Railway-Track
Gemas-Johor-Bahru-Railway-Track
Gemas-Johor-Bahru-Railway-Construction
Gemas-Johor-Bahru-Railway-Construction
8- Dismantling top tier scaffolding
8- Dismantling top tier scaffolding
02
02
Gemas–Johor Bahru Electrified Double Track (EDT). Skin Wall Works for CBP & Sheet Pile Walls
Categories :
Other projects
URL : View Project
IMG-20240402-WA0015
IMG-20240402-WA0015
IMG-20220905-WA0057
IMG-20220905-WA0057
IMG-20220712-WA0018
IMG-20220712-WA0018
IMG-20220611-WA0106
IMG-20220611-WA0106
WhatsApp Image 2023-11-23 at 10.49.51
WhatsApp Image 2023-11-23 at 10.49.51
Proposed Development of 2 Apartment Towers. Apartment Tower Development Works
Categories :
Slope Stabilization
URL : View Project
1620011259e63aa3467b7c1daeca62a0ddb6a36d6a
1620011259e63aa3467b7c1daeca62a0ddb6a36d6a
ZITRO HOTEL
Categories :
Construction Works
URL : View Project
pergau site
pergau site
TNB PERGAU SITE OFFICE
Categories :
Construction Works
URL : View Project
Screenshot 2024-04-03 155332
Screenshot 2024-04-03 155332
Screenshot 2024-04-03 155249
Screenshot 2024-04-03 155249
Screenshot 2024-04-03 155218
Screenshot 2024-04-03 155218
JKR OFFICE BLUE VALLEY
Categories :
Construction Works
URL : View Project
3
3
Website-SG-CP2-0222-300×169
Website-SG-CP2-0222-300×169
Proposed Development of 1 Commercial Block (CP2). Commercial Building Development Works
Categories :
MICROPILING WORKS
URL : View Project
WhatsApp Image 2022-10-31 at 07.48.42
WhatsApp Image 2022-10-31 at 07.48.42
WhatsApp Image 2022-11-05 at 10.53.16
WhatsApp Image 2022-11-05 at 10.53.16
WhatsApp Image 2022-12-01 at 11.27.44
WhatsApp Image 2022-12-01 at 11.27.44
WhatsApp Image 2023-03-01 at 10.55.40
WhatsApp Image 2023-03-01 at 10.55.40
WhatsApp Image 2023-03-01 at 10.55.41 (1)
WhatsApp Image 2023-03-01 at 10.55.41 (1)
Construction of 2 JKME Buildings (DBKL). Micropile Works
Categories :
MICROPILING WORKS
URL : View Project
WhatsApp Image 2023-10-22 at 16.21.03 (1)
WhatsApp Image 2023-10-22 at 16.21.03 (1)
WhatsApp Image 2023-10-13 at 09.07.02
WhatsApp Image 2023-10-13 at 09.07.02
WhatsApp Image 2023-11-07 at 13.52.51
WhatsApp Image 2023-11-07 at 13.52.51
WHILEA_1
WHILEA_1
IMG-20231003-WA0053
IMG-20231003-WA0053
IMG-20231102-WA0007
IMG-20231102-WA0007
Underground Tunnel Construction – Sunway South Quay (CP2) & Elephant Walk. Shotcrete Works
Categories :
Other projects
URL : View Project
WhatsApp Image 2022-03-16 at 9.45.51 AM
WhatsApp Image 2022-03-16 at 9.45.51 AM
WhatsApp Image 2022-03-16 at 9.45.59 AM (2)
WhatsApp Image 2022-03-16 at 9.45.59 AM (2)
WhatsApp Image 2022-03-16 at 9.46.04 AM (1)
WhatsApp Image 2022-03-16 at 9.46.04 AM (1)
Entrance Gate, Guard House, Access Road & Bridge Construction. Infrastructure, Bridge Construction & Road Upgrading Works
Categories :
MICROPILING WORKS
URL : View Project
WhatsApp Image 2020-08-07 at 15.35.37
WhatsApp Image 2020-08-07 at 15.35.37
WhatsApp Image 2020-09-02 at 11.35.33
WhatsApp Image 2020-09-02 at 11.35.33
WhatsApp Image 2020-09-05 at 15.33.47
WhatsApp Image 2020-09-05 at 15.33.47
Damansara–Shah Alam Elevated Expressway (DASH) – Package CB2. Mainline Construction & Associated Works
Categories :
MICROPILING WORKS
URL : View Project
1. NEW (2)
1. NEW (2)
2. NEW
2. NEW
20160129_135215
20160129_135215
IMG_6623
IMG_6623
IMG-20160307-WA0003
IMG-20160307-WA0003
3. NEW
3. NEW
IMG-20150715-WA0018
IMG-20150715-WA0018
IMG-20160303-WA0010
IMG-20160303-WA0010
IMG-20160305-WA0002
IMG-20160305-WA0002
IMG-20160305-WA0004
IMG-20160305-WA0004
setiawangsa
setiawangsa
20160304_101000
20160304_101000
IMG_0027
IMG_0027
IMG_3043
IMG_3043
IMG_4071
IMG_4071
IMG_0033
IMG_0033
IMG_0174
IMG_0174
IMG_6334
IMG_6334
IMG_6335
IMG_6335
IMG_6346
IMG_6346
IMG_6823
IMG_6823
Setiawangsa–Pantai Expressway (SPE) – Kerinchi Interchange. Slope Works
Categories :
Other projects
URL : View Project
titiwangsa-mrt-station-august-2022-01-large
titiwangsa-mrt-station-august-2022-01-large
titiwangsa-mrt-station-july-2022-01-large
titiwangsa-mrt-station-july-2022-01-large
titiwangsa-mrt-station-may-2022-01-large
titiwangsa-mrt-station-may-2022-01-large
PY17_Titiwangsa_MRT_Entrance_B_20221215_120929
PY17_Titiwangsa_MRT_Entrance_B_20221215_120929
Titiwangsa Station (ST2) – Addition & Alteration Works. Micropile Works & Associated Works
Categories :
MICROPILING WORKS
URL : View Project
teh-bunga-1173×440
teh-bunga-1173×440
information-1173×440
information-1173×440
nutrisi-1173×440
nutrisi-1173×440
soya-bean-1173×440
soya-bean-1173×440
yeos-1173×440
yeos-1173×440
Slope Repair & Stabilisation Works. Grouting Works
Categories :
Other projects
URL : View Project
inst-profile-header-tar-umt
inst-profile-header-tar-umt
TUNKU ABDUL RAHMAN UNIVERSITY COLLEGE
Categories :
Slope Stabilization
URL : View Project
WhatsApp Image 2022-12-05 at 10.40.18
WhatsApp Image 2022-12-05 at 10.40.18
WhatsApp Image 2023-01-11 at 11.38.59(1)
WhatsApp Image 2023-01-11 at 11.38.59(1)
WhatsApp Image 2022-12-05 at 10.40.19 (1)
WhatsApp Image 2022-12-05 at 10.40.19 (1)
WhatsApp Image 2022-12-05 at 10.40.17 (2)
WhatsApp Image 2022-12-05 at 10.40.17 (2)
WhatsApp Image 2022-08-08 at 9.10.38 AM (2)
WhatsApp Image 2022-08-08 at 9.10.38 AM (2)
Pumping Station 3 – Main Water Reticulation (Plot A & B). Soil Nailing Works
Categories :
Slope Stabilization
URL : View Project
WhatsApp Image 2022-07-15 at 12.13.35 PM
WhatsApp Image 2022-07-15 at 12.13.35 PM
WhatsApp Image 2023-07-06 at 17.41.17
WhatsApp Image 2023-07-06 at 17.41.17
WhatsApp Image 2022-07-15 at 12.13.28 PM
WhatsApp Image 2022-07-15 at 12.13.28 PM
WhatsApp Image 2022-07-15 at 12.13.27 PM (1)
WhatsApp Image 2022-07-15 at 12.13.27 PM (1)
Sunway Medical Centre Phase 4 (SMC4). Development Works
Categories :
MICROPILING WORKS
URL : View Project
WhatsApp Image 2022-07-15 at 12.13.27 PM (1)
WhatsApp Image 2022-07-15 at 12.13.27 PM (1)
WhatsApp Image 2022-07-15 at 12.13.28 PM
WhatsApp Image 2022-07-15 at 12.13.28 PM
WhatsApp Image 2022-07-15 at 12.13.35 PM
WhatsApp Image 2022-07-15 at 12.13.35 PM
WhatsApp Image 2023-07-06 at 17.41.17
WhatsApp Image 2023-07-06 at 17.41.17
Sunway Medical Centre Ipoh – 8-Storey Private Medical Centre. Soil Investigation, Micropile & Shotcrete Works
Categories :
MICROPILING WORKS
URL : View Project
WhatsApp Image 2021-11-18 at 13.00.27(1)
WhatsApp Image 2021-11-18 at 13.00.27(1)
WhatsApp Image 2021-11-19 at 12.49.46
WhatsApp Image 2021-11-19 at 12.49.46
WhatsApp Image 2021-11-30 at 10.58.42(1)
WhatsApp Image 2021-11-30 at 10.58.42(1)
WhatsApp Image 2021-10-26 at 08.55.49
WhatsApp Image 2021-10-26 at 08.55.49
MEMBINA DAN MENYIAPKAN SATU (1) BLOK KUARTERS KELAS F & G (4 PINTU) UNTUK PEJABAT HUTAN DAERAH CAMERON HIGHLANDS PAHANG DARUL MAKMUR
Categories :
MICROPILING WORKS
URL : View Project
110-3
110-3
110-2
110-2
112
112
113
113
116
116
117
117
KLCC North East Car Park (NEC) – Package 1. Car Park Construction & Associated Works
Categories :
GROUND ANCHOR WORKS
URL : View Project
33
33
64
64
32
32
31
31
65
65
DSCN3701
DSCN3701
3-Storey Commercial Complex with 3 Basement Levels. Commercial Building, Basement Car Park & Security Tunnel Works
Categories :
GROUND ANCHOR WORKS
URL : View Project
CIMG0904
CIMG0904
CIMG0906
CIMG0906
CIMG0976
CIMG0976
Mixed Development – Serviced Apartments, Shopping Complex & Office Towers. Mixed Development Construction Works
Categories :
GROUND ANCHOR WORKS
URL : View Project
P1010240
P1010240
User comments
User comments
User comments
User comments
User comments
User comments
CADANGAN PEMBANGUNAN ISTANA BARU TERENGGANU MUKIM CENDERING, TERENGGANU DARUL IMAN
Categories :
GROUND ANCHOR WORKS
URL : View Project
P1020074
P1020074
P1020260
P1020260
photo0083
photo0083
P1000903
P1000903
P1000889
P1000889
P1000886
P1000886
17-Storey Office Building with 3 Basement Parking Levels. Office Building & Basement Car Park Construction Works
Categories :
GROUND ANCHOR WORKS
URL : View Project
bhkolam13-o_BHfield_image_socialmedia.var_1642049882
bhkolam13-o_BHfield_image_socialmedia.var_1642049882
KAJIAN KOLAM BEKAS LOMBONG SEBAGAI KOLAM TAKUNGAN ALIRAN AIR BANJIR DI LEMBANGANSUNGAI SELANGOR
Categories :
DEEP WELL DRILLING WORKS
URL : View Project
CIMG6000
CIMG6000
CIMG6008
CIMG6008
CIMG6007
CIMG6007
CIMG5974
CIMG5974
CADANGAN PEMBANGUNAN TAPAK PELUPUSAN SISA PEPEJAL SANITARI DI TEMERLOH, PAHANG DARUL MAKMUR
Categories :
DEEP WELL DRILLING WORKS
URL : View Project
81648906925_freesize
81648906925_freesize
MENAIKTARAF SISTEM SALIRAN SG. RASAU FASA II, KOLAM TAKUNGAN BANJIR, DI ATAS LOT 336 & KERJA-KERJA BERKAITAN.
Categories :
DEEP WELL DRILLING WORKS
URL : View Project
Picture6
Picture6
3-Storey Police Station & 18-Storey Quarters Building. USJ 8, UEP Subang Jaya, Selangor
Categories :
DEEP WELL DRILLING WORKS
URL : View Project
DSCN0661
DSCN0661
DSCN0660
DSCN0660
DSCN0466
DSCN0466
IMG-20161111-WA0015
IMG-20161111-WA0015
River of Life (RoL) – Precinct 7 Improvement & Beautification Works. Improvement & Beautification Works
Categories :
CAISSON WORKS
URL : View Project
P1000818
P1000818
P1000810
P1000810
Classroom Extension & Renovation Works – Cempaka Group. Building Extension & Alteration Works
Categories :
CAISSON WORKS
URL : View Project
P1000938
P1000938
P1000957
P1000957
P1000982
P1000982
P1010081
P1010081
PROPOSED CAISSON PILE AT LOT 962, MUKIM BANDAR CHERAS, DAERAH HULU LANGAT FOR CHERAS HONG SOON DEVELOPMENT SDN BHD.
Categories :
CAISSON WORKS
URL : View Project
P1040075
P1040075
P1040078
P1040078
P1040080
P1040080
P1040037
P1040037
P1040034
P1040034
2 Blocks of 24-Storey SOHO & Serviced Apartments. SOHO, Serviced Apartments, Retail & Car Park Construction Works
Categories :
CAISSON WORKS
URL : View Project
20130730_090807
20130730_090807
P1020181
P1020181
P1020184
P1020184
Serviced Apartments & 3-Storey Shop Offices. Lot 32999, Section 1, Bandar Cheras, Hulu Langat, Selangor
Categories :
CAISSON WORKS
URL : View Project
WhatsApp Image 2022-07-15 at 12.13.27 PM (1)
WhatsApp Image 2022-07-15 at 12.13.27 PM (1)
WhatsApp Image 2022-07-15 at 12.13.28 PM
WhatsApp Image 2022-07-15 at 12.13.28 PM
WhatsApp Image 2022-07-15 at 12.13.35 PM
WhatsApp Image 2022-07-15 at 12.13.35 PM
SUNWAY MEDICAL CENTRE 4 (Jet Grouting Works)
Categories :
Other projects
URL : View Project
CIMG2059
CIMG2059
CIMG2068
CIMG2068
CIMG2047
CIMG2047
CIMG2018
CIMG2018
DAYA BUMI PROJECT (Jet Grouting Works)
Categories :
Other projects
URL : View Project
P1030563
P1030563
P1030558
P1030558
P1030554
P1030554
P1030573
P1030573
MMC GAMUDA JV MRT AT MERDEKA STATION (Jet Grouting Works)
Categories :
Other projects
URL : View Project
DSCF2308
DSCF2308
DSCF2326
DSCF2326
PROPOSED MENARA TUN RAZAK, JALAN RAJA LAUT (Jet Grouting Works)
Categories :
Other projects
URL : View Project
IMG-20160822-WA0018
IMG-20160822-WA0018
IMG-20160822-WA0017
IMG-20160822-WA0017
IMG-20160822-WA0013
IMG-20160822-WA0013
2 Blocks of 24-Storey SOHO & Serviced Apartments. Jet Grouting Works
Categories :
Other projects
URL : View Project
IMG-20170502-WA0036
IMG-20170502-WA0036
IMG-20170502-WA0034
IMG-20170502-WA0034
IMG-20170502-WA0041
IMG-20170502-WA0041
IMG-20170502-WA0042
IMG-20170502-WA0042
IMG-20170502-WA0043
IMG-20170502-WA0043
IMG-20170502-WA0035
IMG-20170502-WA0035
IMG-20170502-WA0033
IMG-20170502-WA0033
Stadium Putra & Aquatic Stadium Upgrading Works. Demolition & Renovation Works
Categories :
Other projects
URL : View Project
1
1
2
2
3
3
IMG-20190712-WA0002
IMG-20190712-WA0002
IMG-20190712-WA0003
IMG-20190712-WA0003
IMG-20190712-WA0004
IMG-20190712-WA0004
IMG-20190712-WA0013
IMG-20190712-WA0013
IMG-20190712-WA0015
IMG-20190712-WA0015
Stadium Putra Upgrading Works. Demolition Works
Categories :
Other projects
URL : View Project
Screenshot 2024-04-15 151535
Screenshot 2024-04-15 151535
Screenshot 2024-04-15 151513
Screenshot 2024-04-15 151513
46 Units of 4-Storey Terrace Houses (Type A & B). Jalan 3/9, Bandar Baru Selayang, Gombak, Selangor. Soil Nailing Works
Categories :
Other projects
URL : View Project
20160910_135452
20160910_135452
20160930_132937
20160930_132937
20160910_135450
20160910_135450
20160826_122927
20160826_122927
DUTA-ULU KELANG EXPRESSWAY (DUKE) SECTION 2. BORED PILING WORK AT CH11480 – CH11540 (LHS) ( Bored Pile Works)
Categories :
Other projects
URL : View Project
IMG-20141231-WA0000
IMG-20141231-WA0000
IMG-20141231-WA0001
IMG-20141231-WA0001
IMG-20141231-WA0007
IMG-20141231-WA0007
IMG-20141231-WA0011
IMG-20141231-WA0011
VELOCITY TUNNEL, UNDERPASS & ASSOCIATED WORKS SOIL MIXING WORK & SOIL INVESTIGATION WORKS (Soil Mixing Works)
Categories :
Other projects
URL : View Project
WhatsApp-Image-2022-11-04-at-13.36.17-1.jpeg
WhatsApp-Image-2022-11-04-at-13.36.17-1.jpeg
Deep-Soil-Mixing-7
Deep-Soil-Mixing-7
49 Units of 2½-Storey Terrace Houses. Mukim Petaling, Petaling, Selangor. Soil Mixing Works
Categories :
Other projects
URL : View Project
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
53
53
47
47
ULU JELAI HYDROELECTRIC PROJECT LOT CW2/EM1 (Soil Mixing Works)
Categories :
Other projects
URL : View Project
P1010165
P1010165
Proposed Commercial Development – Lot 52541. Petaling Jaya, Damansara, Petaling, Selangor. Soil Mixing Works
Categories :
Other projects
URL : View Project
images
images
PROPOSED SOIL MIXING WORKS TO THE EXISTING RTG –E-BLOCK AT CONTAINER TERMINAL – 1 OF NORTH PORT (Soil Mixing Works)
Categories :
Other projects
URL : View Project
images
images
92-Storey Office Tower & 5-Storey Office Annex – Tun Razak Exchange (TRX). Concrete Coring Works
Categories :
Other projects
URL : View Project
IMG-20210816-WA0045
IMG-20210816-WA0045
IMG-20210816-WA0044
IMG-20210816-WA0044
IMG-20210723-WA0029
IMG-20210723-WA0029
HQ DIAMOND CORE DRILLING AT MEGAPUR, PAHANG ( Diamond Core Drilling Works)
Categories :
Other projects
URL : View Project
mineral-exploration-drilling-techniques
mineral-exploration-drilling-techniques
2 DRILLING EXPLORATION MEGAPUR COPPER MINE PROJECT ( Diamond Core Drilling Works)
Categories :
Other projects
URL : View Project
pantai2stp-IMG_1721-1024×768
pantai2stp-IMG_1721-1024×768
SSP-Project-Sewage-Treatment-Kuantan-CSTP
SSP-Project-Sewage-Treatment-Kuantan-CSTP
SEWAGE TREATMENT PLANT PROJECT (PHASE 1: PACKAGE 1) PANTAI TRUNK SEWER CONNECTION TUNNEL. SLOPE STABILIZATION WORKS
Categories :
Slope Stabilization
URL : View Project
64cb50fd0219a
64cb50fd0219a
IMGP3601
IMGP3601
5b2396fe41d40
5b2396fe41d40
PROPOSED SLOPE STABILIZATION WORKS AT KM383.53, KM361.60& KM373 TG. MALIM TO BIDOR
Categories :
Slope Stabilization
URL : View Project
3_GAMUDA_Engineering_Construction_Water-Treatment-Power_Sungai-Selangor-Dam@2x
3_GAMUDA_Engineering_Construction_Water-Treatment-Power_Sungai-Selangor-Dam@2x
6_GAMUDA_Engineering_Construction_Water-Treatment-Power_Sungai-Selangor-Dam@2x
6_GAMUDA_Engineering_Construction_Water-Treatment-Power_Sungai-Selangor-Dam@2x
SG.SELANGOR WATER SUPPLY SCHEME PHASE 3 PROPOSED CONSTRUCTION & COMPLETION OF SLOPE STABILIZATION WORK AT KG. GERACHI
Categories :
Slope Stabilization
URL : View Project
WhatsApp Image 2024-08-14 at 09.51.40_d4a44d79
WhatsApp Image 2024-08-14 at 09.51.40_d4a44d79
IMG-20180126-WA0019
IMG-20180126-WA0019
IMG-20180223-WA0030 (1)
IMG-20180223-WA0030 (1)
IMG-20180713-WA0047
IMG-20180713-WA0047
WhatsApp Image 2024-08-14 at 09.51.40_3ab7b054
WhatsApp Image 2024-08-14 at 09.51.40_3ab7b054
emrail 9
emrail 9
emrail 8
emrail 8
emrail 7
emrail 7
emrail 6
emrail 6
emrail 5
emrail 5
emrail 4
emrail 4
emrail 3
emrail 3
emrail 2
emrail 2
emrail 1
emrail 1
Railway Track Restoration & Slope Stabilisation – Package C. Gua Musang to Tumpat, Kelantan. Civil Works
Categories :
Slope Stabilization
URL : View Project
WhatsApp-Image-2024-04-24-at-13.23.33 copy 2
WhatsApp-Image-2024-04-24-at-13.23.33 copy 2
WhatsApp-Image-2024-04-22-at-19.34.24 copy 3
WhatsApp-Image-2024-04-22-at-19.34.24 copy 3
WhatsApp-Image-2024-04-22-at-19.29.26-1 copy 3
WhatsApp-Image-2024-04-22-at-19.29.26-1 copy 3
BANDAR BARU SELAYANG
Categories :
Slope Stabilization
URL : View Project
WhatsApp Image 2024-08-13 at 10.11.25
WhatsApp Image 2024-08-13 at 10.11.25
WhatsApp Image 2024-08-14 at 12.07.11
WhatsApp Image 2024-08-14 at 12.07.11
WhatsApp Image 2024-08-14 at 08.15.48
WhatsApp Image 2024-08-14 at 08.15.48
WhatsApp Image 2024-08-12 at 17.28.09
WhatsApp Image 2024-08-12 at 17.28.09
3 Blocks of Condominiums – Sime Darby Property (Golfhome). Jalan Bukit Kiara 1, Kuala Lumpur. Micropiling Works
Categories :
MICROPILING WORKS
URL : View Project
IMG-20240814-WA0026
IMG-20240814-WA0026
IMG-20240814-WA0029
IMG-20240814-WA0029
IMG-20240814-WA0027
IMG-20240814-WA0027
IMG-20240814-WA0028
IMG-20240814-WA0028
IMG-20240429-WA0059
IMG-20240429-WA0059
IMG-20240814-WA0025
IMG-20240814-WA0025
IMG-20240429-WA0047
IMG-20240429-WA0047
3-Storey Substation Building with 1 Basement (PPU3 – 33kV/11kV). Micropiling Work
Categories :
MICROPILING WORKS
URL : View Project
IMG-20190819-WA0029
IMG-20190819-WA0029
IMG-20190819-WA0033
IMG-20190819-WA0033
IMG-20190819-WA0035
IMG-20190819-WA0035
IMG-20190819-WA0030
IMG-20190819-WA0030
IMG-20190819-WA0032
IMG-20190819-WA0032
Railway Track Rehabilitation – Package B. Track Formation Rehabilitation, Ballast Replacement & Associated Works
Categories :
Slope Stabilization
URL : View Project
61
61
59
59
60
60
58
58
Slope Failure Repair Works – FT185. Slope Repair & Stabilisation Works
Categories :
Slope Stabilization
URL : View Project
IMG-20161208-WA0004
IMG-20161208-WA0004
25
25
ULU JELAI HYDROELECTRIC PROJECT – LOT CW3 POWER INTAKE TOWER AND OPERATION PLATFORM
Categories :
MICROPILING WORKS
URL : View Project
95
95
ø;
ø;
96
96
ULU JELAI HYDROELECTRIC PROJECT – LOT CW1 & CW2
Categories :
Slope Stabilization
URL : View Project
WhatsApp Image 2024-09-23 at 11.23.47 (1)
WhatsApp Image 2024-09-23 at 11.23.47 (1)
WhatsApp Image 2024-09-23 at 11.23.47
WhatsApp Image 2024-09-23 at 11.23.47
2 Blocks of 47-Storey Serviced Apartments (453 Units) & Existing Commercial Building. Development Works
Categories :
MICROPILING WORKS
URL : View Project
earthworks 2
earthworks 2
earthworks 3
earthworks 3
earthworks
earthworks
40-Storey Condominium Development – Modern Plus. Lot 2356, Jalan Kiara 5, Kuala Lumpur. Soil Nailing & Guniting Works
Categories :
Current Projects
URL : View Project
Terang KM15 Completed Project 4
Terang KM15 Completed Project 4
Terang KM15 Completed Project 2
Terang KM15 Completed Project 2
Terang KM15 Completed Project 3
Terang KM15 Completed Project 3
Terang KM15 Cmpleted Project 1
Terang KM15 Cmpleted Project 1
SLOPE REHABILITATION WORKS AT KM15 JALAN TERANG, PERGAU POWER STATION (Slope Protection Works)
Categories :
Slope Stabilization
URL : View Project
Main Drainage System Upgrading for Flash Flood Mitigation. Micropiling Works
Categories :
MICROPILING WORKS
URL : View Project
three stonery 1
three stonery 1
three stonery 2
three stonery 2
three stonery 3
three stonery 3
3-Storey House with Swimming Pool. Residential Building Construction Works
Categories :
Current Projects
URL : View Project
69 Units of 3-Storey Shop Offices & Electrical Substations. Lot 12270 & 12271, Bukit Katil, Hang Tuah Jaya, Melaka
Categories :
Slope Stabilization
URL : View Project
Duta ulu 1
Duta ulu 1
Duta ulu 2
Duta ulu 2
Duta ulu 3
Duta ulu 3
Duta ulu 4
Duta ulu 4
Duta ulu
Duta ulu
DUKE Highway – Slope Remedial & Drainage Works. KM 11.7, Hillview Interchange, DUKE Highway
Categories :
Current Projects
cadangan 1
cadangan 1
cadangan 2
cadangan 2
cadangan 3
cadangan 3
cadangan 4
cadangan 4
cadangan 5
cadangan 5
2 JKME Buildings – DBKL. Lot 48, Section 91, Jalan Cheras, Kuala Lumpur. Micropiling Works
Categories :
Current Projects
micropiles 2
micropiles 2
micropiles 3
micropiles 3
micropiles 4
micropiles 4
micropiles 5
micropiles 5
micropiles 6
micropiles 6
micropiles
micropiles
MVS Southpoint Hotel. Micropile Underpinning Works, Reinforced Concrete Pile Caps & Demolition Works
Categories :
Current Projects
slope 2
slope 2
slope
slope
SLOPE REHABILITATION WORKS IN THE VICINITY OF PERGAU HYDROELECTRIC POWER PLANT (TERANG ROAD KM 17, SJ PERGAU) (Slope Reprofiling with Gabion Cage Protection)
Categories :
Current Projects
storey 1
storey 1
storey 2
storey 2
storey
storey
Phase 1A – 4-Storey Logistics Hub & Multi-Level Car Park. Persiaran Selangor, Section 16, Shah Alam, Selangor
Categories :
Current Projects
24/7 Support