PROPOSED SLOPE STABILIZATION WORKS AT KM383.53, KM361.60& KM373 TG. MALIM TO BIDOR Written by adminApril 4, 2024 SEWAGE TREATMENT PLANT PROJECT (PHASE 1: PACKAGE 1) PANTAI TRUNK SEWER CONNECTION TUNNEL. SLOPE STABILIZATION WORKS Prev Post SG.SELANGOR WATER SUPPLY SCHEME PHASE 3 PROPOSED CONSTRUCTION & COMPLETION OF SLOPE STABILIZATION WORK AT KG. GERACHI Next Post